Star Drilling spent three years geotechnical drilling for the Melbourne Airport Rail Link. A lot of drilling occurred on or under the E.J. Whitten Rail Bridge.
Star Drilling undertook this multiple rig program using both conventional geotechnical methods and sonic drilling to investigate the water side of the Hume Weir Earthen Wall.
Star Drilling has worked multiple rigs with GHD for two years drilling geotechnical bores for the three possible routes of the Northeast Link.